channel
SELF GL-100
Edge Rail: -
Length: 50 / 100 cm
Nominal width: 100 mm
SELF GL-100 channel product specifications | |
---|---|
Material | polymer concrete |
Length | 50 / 100 cm |
Width | 13 cm |
Height | 8 - 25 cm |
Weight | 10 - 18 kg |
Nominal width | 100 |
Joint formation | Tongue and groove |
Clasp | TwistLock fastening |
Load capacity | galvanised slotted grating cl. A15, mesh grating cl. B125, cast grating cl. C250 |
ANRIN TwistLock fastening
Decades of experience and thorough product development in the fields of installation, maintenance and cleaning of drainage systems have produced convincing solutions for durable closure technologies.
ANRIN grate closures are optimized for the respective load classes and combine safety and brand quality with functional design.
The TwistLock closure finds its application in grate designs for channels of nominal width 100 mm.
Advantages:
· Put in place – one rotation – fixed
· Assembly without special tools
· No rattling, no loosening
· No disruptive bars in the channel interior area
· Maintenance-friendly
· Resistant to corrosion
Accessorie for SELF GL-100
Channel body
SELF GL-100
Channel body
100 cm
with pipe socket
SELF GL-100
End cap
SELF GL-100
End cap
with DA / OD 110 pipe socket
SELF GL-100
Sump unit
SELF GL-100
SELF installation instructions
With ANRIN drainage systems, accumulating rainwater should be drained safely and quickly. Moreover, the structural elements have the task of accommodating dynamic loads arising from traffic-related demands and dispersing them to the area of the foundation.
Amongst others, the following technical rules and regulations in their respective valid versions must be observed for the selection, design and installation of ANRIN drainage systems.
The following installation guidelines are schematic representations. These are provided as examples and are non-binding. The information provided here is based on our long-term experience in excavation and road construction as well as the state-of-the-art technology. Despite this, designers and planners are always obligated to check the products and the installation instructions for their appropriateness. The example details are simplified recommendations for execution.
Constructions are to be re-created on a project-specific basis.
1.
Excavate trench. Fill in and pre-compact base course. Apply concrete pad, 3 parts sand + 1 part cement + 1 part water, to base course.
2.
Connect pipe connections to the pipeline.
3.
Place channel elements and sump unit on the concrete pad. Align components so that they are level.
4.
Position end caps.
5.
Complete the series and ensure the level alignment of the components.
6.
Backfill the concrete pad.
7.
Lay the paving.
8.
The surface should be 2 to 5 mm higher than the cover grating.
Instructions and Regulations
Guidelines and regulations
The current guidelines and regulations of the state-of-the-art technology must be observed for the installation.
For example, these are:
DIN EN 1433 „Drainage channels for vehicular and pedestrian areas“
DIN 19580 „Drainage channels for vehicular and pedestrian areas“
RStO „Guidelines for the standardisation of the superstructure of vehicular areas“
DIN EN 206-1 „Concrete. Specification, performance, production and conformity“
DIN EN 1045-2 „Concrete, reinforced and prestressed concrete structures. Part 2: Concrete – Specification, properties,
production and conformity; Application rules for DIN EN 206-1“